TIWAG Power Plant Imst-Haiming! J-YMA Exkursion 2026 – don’t miss the ride!
J-YMA Exkursion 2026
Join us for an exclusive on-site look at one of Tyrol's largest hydropower construction sites – the TIWAG diversion power plant Innstufe Imst-Haiming!
The new plant will be connected to the existing Prutz-Imst power station via a roughly 14 km underground headrace tunnel, reusing water already run through Prutz-Imst – no new weir on the Inn required. A great chance to see large-scale hydropower engineering in action.
Afterwards, we head to Innsbruck for a relaxed evening with food and drinks together. On Saturday, September 12, a laid-back get-together for young engineers to connect follows – more details soon!
Good to know
Highlights
- 1 day 4 hours
- In person
Location
Mötz Bahnhof
Bundesstraße Str.Nr. 6013/km 36,6
6424 Silz
How do you want to get there?

Agenda
-
Meeting point: Mötz Bahnhof
-
Transfer: Mötz Bahnhof - TIWAG Besucherzentrum Silz
-